Kansas Department of Administration, Division of Facilities Management
This image/email designed to try to catch spammers. Home | Accounts & Reports | Budget | Facilities | DISC | Personnel | Purchases | Printing | Surplus


Job/Project List

NOTE: All projects listed below require the prime bidder to be pre-qualified. Click here for instructions on how to get pre-qualified.

** Construction Documents for a project with title preceded by a double asterisk (**) are being distributed through an electronic plan room “Integrated Digital Technologies”. This site requires a free registration so all interested parties can access the plans and specifications and be notified of additional addendum postings. Contractors may download the documents for printing in-house, view them on line or have them sent to a local printer. Plan holders/bidders will be responsible for printing costs associated with these documents. Contractors, subcontractors and suppliers are responsible for understanding the scope of the work involved in these documents and for obtaining the appropriate documents for their work. Please click here to be transferred to the IDT website

Current Job List
Project
Number
Project Title Agency Name
Project Location
Estimate
Cost
Bid
Date
Architect
Engineer
A-011078 ** RENOVATE DISTRICT FOUR OFFICE HVAC AND ELECTRIC DEPARTMENT OF TRANSPORTATION
411 W 14TH, CHANUTE
$100,000.00 12/15/2009 FRANK BURNAM
JIM BROOKE
A-011179 TOPEKA HEADQUARTERS ATTIC RENOVATION KANSAS BUREAU OF INVESTIGATION
1620 SW TYLER, TOPEKA
$200,000.00 12/15/2009 EMIG AND ASSOCIATES ARCHITECTS
LATIMER, SOMMERS & ASSOCIATES
A-011218 **VARIOUS BUILDINGS METAL ROOF RETROFIT LANSING CORRECTIONAL FACILITY
LANSING CORRECTIONAL FACILITY
$610,000.00 12/15/2009 KEVIN MORGAN, R.A.
A-011245 ** FIELD MAINTENANCE SHOP NO. 9 RENOVATION ADJUTANT GENERAL
2810 SOUTH TOPEKA, TOPEKA
$515,000.00 12/2/2009 HORST, TERRILL & KARST ARCHITECTS, P.A.
LATIMER, SOMMERS & ASSOCIATES
A-011285 ** SEATON LINK ROOF REMEDIATION KANSAS STATE UNIVERSITY
KANSAS STATE UNIVERSITY, MANHATTAN
$215,000.00 12/17/2009 BG CONSULTANTS, INC.

NOTE: KUMC Applegate Energy Center Utility distribution (A-010677d) (Click Here for special requirements.)

NOTE: KU School of Pharmacy Package F (A-010933) (Click Here for special requirements.)

NOTE: KU School of Pharmacy Package H (A-010933) (Click Here for special requirements.)

NOTE: All projects listed above require the prime bidder to be pre-qualified. Click here for instructions on how to get pre-qualified.

This page was generated on 11/21/2009 9:17:09 AM

** NOTICE **
Contract documents for these projects will be available to General Contractors and Major Sub-contractors only. General Contractors will be allowed a maximum of two (2) sets of documents. Major Sub-contractors will be allowed one (1) set of documents. DFM reserves the right to limit General Contractors to one (1) set of plans. Addenda will not be issued to plan holders that do not obtain plans from the DFM plan room.