Job/Project List

NOTE: All projects listed below require the prime bidder to be pre-qualified. Click here for instructions on how to get pre-qualified.

** Construction Documents for a project with title preceded by a double asterisk (**) are being distributed through an electronic plan room “Integrated Digital Technologies”. This site requires a free registration so all interested parties can access the plans and specifications and be notified of additional addendum postings. Contractors may download the documents for printing in-house, view them on line or have them sent to a local printer. Plan holders/bidders will be responsible for printing costs associated with these documents. Contractors, subcontractors and suppliers are responsible for understanding the scope of the work involved in these documents and for obtaining the appropriate documents for their work. Please click here to be transferred to the IDT website

Current Job List
Project
Number
Project Title Agency Name
Project Location
Estimate
Cost
Bid
Date
Architect
Engineer
A-010677(D) APPLEGATE ENERGY CENTER- SEE NOTE BELOW UNIVERSITY OF KANSAS MEDICAL CENTER
KANSAS CITY
$1,400,000.00 7/16/2009
BLACK & VEATCH COMPANY
A-010864 EXTERIOR MODIFICATIONS AND REROOF GENERAL RICHARD KANSAS STATE UNIVERSITY
KANSAS STATE UNIVERSITY, MANHATTAN
$185,000.00 7/28/2009 KANSAS STATE UNIVERSITY
A-011023(A) COLES HALL CEILING AND LIGHTING IMPROVEMENTS KANSAS STATE UNIVERSITY
KANSAS STATE UNIVERSITY, MANHATTAN
$120,000.00 7/30/2009
BARTLETT & WEST ENGINEERS, INC
A-011045 JOSEPH R PEARSON HALL REPAIR AND WATERPROOF CONCRE UNIVERSITY OF KANSAS
1122 W CAMPUS RD
$85,000.00 7/9/2009 UNIVERSITY OF KANSAS
A-011074 NEOSHO WILDLIFE AREA OFFICE SMALL OFFICE BUILDING DEPARTMENT OF WILDLIFE & PARKS
NEOSHO COUNTY
$142,000.00 7/9/2009 LUKE PETERSON KAYE
PEARSON KENT MCKINLEY RAAF ENGINEERS LLC
A-011138 SHELLENBERGER HALL 214 FUME HOOD REPLACEMENT KANSAS STATE UNIVERSITY
KANSAS STATE UNIVERSITY, MANHATTAN
$101,000.00 7/21/2009
ORAZEM & SCALORA ENGINEERING P.A.
A-011150 A DORM & B DORM METAL ROOF RETROFIT TOPEKA CORRECTIONAL FACILITY
TOPEKA CORRECTIONAL FAC - CENTRAL/RDU
$525,000.00 7/21/2009 KEVIN MORGAN, R.A.
A-011168 EAST F CELL HOUSE METAL ROOF RETROFIT EL DORADO CORRECTIONAL FACILITY
EL DORADO CORRECTIONAL FAC., EL DORADO
$285,000.00 7/23/2009 KEVIN MORGAN, R.A.

NOTE: KU School of Pharmacy Package G (A-010933) (Click Here for special requirements.)

NOTE: KUMC Applegate Energy Center Utility distribution (A-010677d) (Click Here for special requirements.)

NOTE: All projects listed above require the prime bidder to be pre-qualified. Click here for instructions on how to get pre-qualified.

This page was generated on 7/4/2009 7:21:47 PM

** NOTICE **
Contract documents for these projects will be available to General Contractors and Major Sub-contractors only. General Contractors will be allowed a maximum of two (2) sets of documents. Major Sub-contractors will be allowed one (1) set of documents. DFM reserves the right to limit General Contractors to one (1) set of plans. Addenda will not be issued to plan holders that do not obtain plans from the DFM plan room.