|
Job/Project List
NOTE: All projects listed below require the prime bidder to be
pre-qualified. Click here for instructions on how to get pre-qualified.
Construction Documents for all projects listed below are being
distributed through an electronic plan room “Integrated
Digital Technologies”. This site requires a free registration so all
interested parties can access the plans and specifications and be notified of additional
addendum postings. Contractors may download the documents for printing in-house, view
them on line or have them sent to a local printer. Plan holders/bidders will be responsible
for printing costs associated with these documents. Contractors, subcontractors and
suppliers are responsible for understanding the scope of the work involved in these
documents and for obtaining the appropriate documents for their work. Please
click here to be transferred to the
IDT website.
Current Job List
Project
Number |
Project Title |
Agency Name
Project Location |
Estimate
Cost |
Bid
Date |
Architect
Engineer |
|
A-010808(C) |
TANNER HALL ANNEX RENOVATIONS |
PITTSBURG STATE UNIVERSITY
PITTSBURG STATE UNIVERSITY |
$1,877,840.00 |
2/22/2012 |
AMAI ARCHITECTURE
SMITH & BOUCHER, INC. |
|
A-011575 |
WAKEENEY SUBAREA BAY ADDITION |
DEPARTMENT OF TRANSPORTATION
4 BLKS N OF I-70 ON US-283, WAKEENEY |
$725,000.00 |
2/28/2012 |
DON SCHULTZ
JIM BROOKE |
|
A-011576 |
COLBY SUBAREA BAY ADDITION |
DEPARTMENT OF TRANSPORTATION
1020 S RANGE AVE, COLBY |
$675,000.00 |
2/27/2012 |
DON SCHULTZ
JIM BROOKE |
|
A-011709 |
MCCRAY HALL NEW SEATING & FLOORING IN RECITAL HALL |
PITTSBURG STATE UNIVERSITY
PITTSBURG STATE UNIVERSITY |
$247,472.00 |
2/23/2012 |
HOWARD & HELMER ARCHITECTS P.A.
PROFESSIONAL ENGINEERING CONSULTANTS |
|
A-011741 |
DOCKING STATE OFFICE BUILDING ELECTRICAL DISTRIBUT |
DIV OF FACILITIES MANAGEMENT
915 HARRISON ST, TOPEKA |
$311,798.00 |
3/8/2012 |
LOCHNER, BWR DIVISION |
|
A-011775 |
CUNNINGHAM HALL CENTRAL CORRIDOR IMPROVEMENTS |
FORT HAYS STATE UNIVERSITY
FT HAYS STATE UNIVERSITY |
$260,000.00 |
3/20/2012 |
LANDMARK ARCHITECTS & ENG'R
|
|
A-011810 |
ANTHONY GEODESIC DOME REROOF |
DEPARTMENT OF TRANSPORTATION
ANTHONY |
$34,110.00 |
2/14/2012 |
DONNA GRIFFIN
|
|
A-011847 |
PICKEN TO SHERIDEN HALL TUNNEL TOP REPLACEMENT |
FORT HAYS STATE UNIVERSITY
FORT HAYS STATE UNIVERSITY |
$150,000.00 |
2/16/2012 |
LANDMARK ARCHITECTS & ENG'R
|
|
A-011851 |
GIBSON DINING HALL & SHIRK ANNEX REROOF |
PITTSBURG STATE UNIVERSITY
PITTSBURG STATE UNIVERSITY |
$225,000.00 |
3/8/2012 |
HOWARD & HELMER ARCHITECTS P.A.
|
NOTE: Emporia State University Memorial Union Remodel and Renovation Audio Visual Package. Plans and specification available at Ferrell Construction. Call Tammy Shaw at 785-354-4309 for questions about the Ferrell website.
NOTE: All projects listed above require the prime bidder
to be pre-qualified. Click here for instructions on how to get pre-qualified.
This page was generated on
2/12/2012 11:37:46 AM
** NOTICE **
Contract documents for these projects will be available to General Contractors and
Major Sub-contractors only. General Contractors will be allowed a maximum of two
(2) sets of documents. Major Sub-contractors will be allowed one (1) set of documents.
DFM reserves the right to limit General Contractors to one (1) set of plans.
Addenda will not be issued to plan holders that do not obtain plans from the DFM
plan room.
|